perforated roller shutter door slat forming machine rolling shutter strip making machine
The total length of the equipment |
Length 10000mm width 1300mm height 1200mm |
Equipment weight |
5tons |
The motor power |
Motor 5.5Kw pump station5.5Kw working voltage 380V or customized |
Production speed |
10--18 m/min |
The transmission way |
1 inch chain drive |
rack |
Large frame: 350H section steel |
shaft |
UP:16 row axis dow:18 row axis diameter 70 mm solid shaft |
The thickness of the plate |
20 mm |
Set of |
Galvanized pipe finishing, electrostatic spraying |
Wheel material |
45# steel hard chrome plating |
The molding part |
Divided into precision wheel rotation forming, forming effect is good, reduce the friction between wheels and raw materials, debugging convenient, fast. |
Numerical control system |
Easy control king, letter letter press button screen, counter, |
shear |
Iron plate welding frame, hydraulic cylinder automatic shear, hydraulic cylinder automatic pressure |
In the thickness of the plate |
0.3 mm - 0.8 mm |
Into the plate width |
1250 mm |
accessories |
Two sets of feeding rack, vulnerable parts |
Warranty period |
12 months |
process for work: decoiler→feeding→roll forming→measuring length→cutting to length→product to stand
FAQ
Q: if I want a custom machine, what should I provide?
A: you need to provide the outline, material, thickness, voltage and your special requirements.
Q:What are your terms of payment and delivery?
A:After confirming the required model, 30% down payment is made and the remaining 70% is delivered to balance payment after inspecting the machine before delivery.Production will be arranged after the deposit is received. The goods will be delivered in about days
Q:When is your warranty?
A:The machine will be repaired free of charge for 12 months from the date of shipment.The machine was installed and well tested before shipment.Simple operation.Usually, our customers operate the machines well according to the instructions.You can also inspect the machines and learn how to operate them in our factory before shipment.It only takes 2 hours and you can do it. We will also send you a set of CD and specification (Chinese and English) with the coiling machine. They can teach you how to operate the machine.
Q:What can you do if the machine breaks down?
A: the warranty period of our machine is 12 months. If the broken parts can't be repaired, we will send new parts to replace the broken parts for free. But if the warranty period is over, you need to pay the express fee.We can solve problems through negotiation and provide technical support for the whole life of the equipment.If you need us to send engineers to your factory, you need to pay for travel expenses, such as visas, round-trip air tickets, hotels (from our factory until we return to our factory).You should also watch out for his safety.
Q;How to visit your company?
1: fly to Beijing airport, take high-speed rail from Beijing south station to cangzhou west station (1 hour).2: fly to Shanghai airport: take high-speed train from Shanghai hongqiao to cangzhou west (4.5 hours), then we can pick you up.